Base construction of buildings
Base construction or ‘base build’ refers to the works done, usually by speculative office building developers, to erect the ‘basic’ elements of a buildings. Once the building is let to tenants they are then given responsibility or the fit out of the interior, that is, making interior spaces suitable for occupation.
‘Base build’ may also be referred to as ‘shell and core’, and typically includes:
- Primary structure.
- Building envelope (roof and façade) in whole or part.
- Mechanical and supply systems (electricity, HVAC, telephone, water, drainage, gas, etc.,), up to the point of contact with individual tenant spaces.
- Public circulation and fire egress areas, such as lobbies, corridors, elevators and public stairs.
Once practical completion of the base build has been finished, the tenant fits out their part of the lettable space. Tenants may be given access prior to practical completion to carry out parts of the works, and may be allowed a rent-free period for the duration of fit out works.
The agreement to lease between landlord and tenant should clearly define who does what, to what standard, and the periods allowed, including:
- What comprises the base build, including space provision in common areas for tenant equipment such as standby generators, extra chillers, or uninterrupted power supply plant.
- What elements of the fit out may be installed by the tenant but funded by the developer/landlord.
- What tenant equipment is to be installed in common areas.
When the tenant takes occupation of the space, it is wise to undertake a conditions survey so that they can notify the developer or landlord of any defects or omissions. It is relatively common that defects in the base construction do not get rectified by the contractors quickly enough for the fit out to be completed. This can lead to the tenant’s contractors making good the defects and then issuing a claim to the base build contractors for the cost of the works.
For more information see: Shell and core.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Cladding remediation programmes, transparency and target date.
National Audit Office issue report on cladding remediation.
HBPT and BEAMS Jubilees. Book review.
Does the first Labour budget deliver for the built environment?
What does the UK Budget mean for electrical contractors?
Mixed response as business pays, are there silver linings?
A brownfield housing boost for Liverpool
A 56 million investment from Homes England now approved.
Fostering a future-ready workforce through collaboration
Collaborative Futures: Competence, Capability and Capacity, published and available for download.
Considerate Constructors Scheme acquires Building A Safer Future
Acquisition defines a new era for safety in construction.
AT Awards evening 2024; the winners and finalists
Recognising professionals with outstanding achievements.
Reactions to the Autumn Budget announcement
And key elements of the quoted budget to rebuild Britain.
Chancellor of the Exchequer delivers Budget
Repairing, fixing, rebuilding, protecting and strengthening.
Expectation management in building design
Interest, management, occupant satisfaction and the performance gap.
Connecting conservation research and practice with IHBC
State of the art heritage research & practice and guidance.
Innovative Silica Safety Toolkit
Receives funding boost in memory of construction visionary.
Gentle density and the current context of planning changes
How should designers deliver it now as it appears in NPPF.
Sustainable Futures. Redefining Retrofit for Net Zero Living
More speakers confirmed for BSRIA Briefing 2024.
Making the most of urban land: Brownfield Passports
Policy paper in brief with industry responses welcomed.
The boundaries and networks of the Magonsæte.